by ElSecundo » Mon May 06, 2013 6:40 am
Went through the garage this morning, and the platform has settled a bit more -- not much, and there's no hint of imminent failure.
My friend Brad, who's been a tremendous help in the design and build of this thing, had a new idea to simplify the design, and cut out a significant amount of work. If we used the idea, we'd fall short on one of the original design parameters, ie, height difference from 1.5 feet to 5.0 feet. We've achieved 1.0 feet to 5.0 feet, but this design change would mean 1.0 feet to 4.0 feet -- which might not be bad in terms of track visibility.
If we modified his idea to reach 5.0 feet, we'd lose some stability, and we'd have to compensate in some way. But in the 1.0 feet to 4.0 feet range, there are some big gains and some minor losses. I'm committed to the current design, though, and I'm expecting to have a second unit connected to the first this week. I know I won't work on it this weekend when Jenny gets here.
Large strides were made this weekend in terms of process. Process is very important to building this thing well, and building it efficiently. Current sticking point: I need some kind of template for aligning the legs and their bracing.