Braiding has started.. I'm doing the 2 sections that drop in to change between oval and road course first as they have a special challenge.
I'm braiding each section of the layout individually and dropping the braid down through the track at every point lanes meet from section to section.
Thats fine for most of the track..drill a hole down through the support beam under the joint, and drop the braid down to connect with
a wire nut.. but where the drop in section is I can't to that. I had to run the braid over the edge and back underneath so it can be wired
to a molex type plug for quick and easy changeovers.
I used a round over bit in my router to make some channels on the backside for each braid to sit in.. seems like its going to work fine.
I'm cutting all the braid to length for each section and cleaning the oil residue off with mineral sprits.
Just prior to putting it in the gain, I'm peeling the tape backing and heating the exposed sticky part with a heat gun. The heat
is making it super sticky and the braid is laying perfectly as I go along.. There are a few steps beyond what you would do with
copper tape, but the end result is so worth the extra time.
One section done, the next one is taped.. Hopefully I'll have a substantial amount done by tonight.




.