I have a scaley sport track that is temporarily in a non air conditioned space. Since I'll be out of commission till the fall, was wondering the best way to store the layout over the summer. New Jersey gets hot and HUMID. I plan on covering with drop cloth's, but was wondering if rails should be coated with clipper oil or something.
Bob e