Got a little behind with finishing up the new track................
I ended up putting on 3 mist coats, 3 light coats and 1 heavy (wet) coat, with 1 hour drying times in between each one of the mist and light coats and 24 hours between the last light coat and the final wet coat and............no problems. I left the finish on the two cars as matte, rather than gloss, by spraying the heavy coat from further away. I like the effect.
So, I have some more experimenting to do later this Summer (drying time). I'll have a formula to work from before I do my next clear coat on a car.
Allan